Electrical safety testing
IEC 62368-1 and the IEC 60335 / 61010 families — the testing that decides whether a product can carry a safety mark at all.
- IEC 62368-1
- IEC 60335-1
- IEC 61010-1
- IEC 61558-1
- IEC 60529 (IP)
2–3 production units plus one spare, final firmware, with the power supply you intend to ship
7–10 working days from sample receipt; 48-hour pre-scan available
Safety testing answers one question: under a single fault, does the product stay safe? Everything else in the report — creepage, clearance, temperature rise, abnormal operation — is evidence for that answer.
How we run it
We build the test plan from the product’s construction and its intended use, not from a template. A 65 W USB-C adapter and a 65 W LED driver sit under different clauses even when they look alike on the bench, and getting that wrong is how a project loses two weeks on a retest.
- Construction review against the clause set before any sample is powered.
- Critical components checked against the certificate the supplier actually holds — not the datasheet claim.
- Abnormal tests run to the clause that applies, with the failure mode photographed and logged.
What the report tells you
Every non-compliance is written with its clause reference and the measured value next to the limit, so a hardware engineer can act on it without asking us what we meant. Where a fix is obvious we say so; where it is a design decision, we say that instead.
Scope is confirmed against our CNAS accreditation before we accept samples. If a clause falls outside it, you hear that on day one rather than in the report.
What you receive
- Test report (PDF, signed)
- Clause-by-clause results table
- Non-compliance list with clause references
- Photo appendix of the as-tested build
Frequently asked
Do you test prototypes or only production units?
Both, but the report states which build was tested. A prototype report is useful for design decisions and generally not accepted for a declaration of conformity.
Can you test a product that already failed elsewhere?
Yes, and it is common. Send the earlier report if you have it — it shortens the plan.
Is the report accepted in the EU and UK?
The report is evidence; the manufacturer signs the declaration of conformity. What matters is that the standard edition and the test scope match the route you are claiming.
Send the product. Get a written route.
Standards, sample quantity, timeline and deliverables confirmed before samples move.