United States — FCC equipment authorisation
Certification, SDoC or nothing at all — which one applies depends on whether the device is intentional, unintentional or incidental.
| Applies to | Electronic equipment marketed in the US that can emit radio frequency energy — which in practice includes almost everything with a clock or a switching supply |
|---|---|
| Rule or standard | 47 CFR Part 15 (Subparts B and C) and Part 18 for industrial, scientific and medical equipment |
| Who confirms conformity | A Telecommunication Certification Body issues the grant for certification; the supplier declares for SDoC |
| Validity | A grant stays valid while the device is unchanged. Class II permissive changes cover limited modifications. |
The FCC does not have one route. It has three, and picking the wrong one is the most common US compliance mistake we see from exporters.
- Certification — for intentional radiators. Requires a grant from a Telecommunication Certification Body.
- Supplier’s Declaration of Conformity — for most unintentional radiators. The supplier tests and declares; no filing.
- No authorisation — incidental radiators only.
Only an FCC-recognised TCB can issue the grant. A test lab can produce the report the TCB needs, and that is the part we do.
TMC LAB tests and prepares the technical evidence. For routes where a scheme requires an authorised body to issue the certificate, that body does the issuing — we do not claim to be a notified body or to sign the declaration on your behalf.
Tell us the product and the market you are selling into, and we will say plainly which parts we can cover and which parts need another party.
Frequently asked
Can you issue the FCC certificate?
No. A TCB issues the grant. We produce the test report the TCB accepts — and we say so plainly rather than implying otherwise.
Does a product with no radio need FCC?
If it contains a digital circuit, it is likely an unintentional radiator and needs SDoC.