Independent testing & market access support for global markets cert@tmc-lab.com +86 755 8664 2861
Solutions Testing services Certification Accreditation Success stories Insights Request a quote →
Uncategorized

Pre-scan first, formal run second

An EMC formal run on an unproven design is an expensive way to learn where the problem is. A pre-scan is a cheaper one.

TMC LAB laboratory

The economics are simple. A pre-scan costs a fraction of a formal run, and it produces the one thing a formal run does not: the location of the emission source.

What a pre-scan gives you

  • Spectrum plots with the offending frequencies identified, not just a pass or fail.
  • Near-field probing to separate a board-level radiator from a cable-driven one.
  • Enough information to attempt a fix before the formal booking.

What it does not give you

A compliance result. Pre-scan measurements are indicative, taken on an engineering setup. The formal run is still the formal run.

When to skip it

If the design is a variant of a product you have already tested, with a documented change list and no change to the radio, power stage or enclosure, a full pre-scan may be unnecessary. That judgement should be made with the laboratory, on the change list, not on optimism.

Next step

Need this mapped to your product?

Send the product and destination market. An engineer replies with standards, samples and a schedule.

Request a quote