Independent testing & market access support for global markets cert@tmc-lab.com +86 755 8664 2861
Solutions Testing services Certification Accreditation Success stories Insights Request a quote →
04 / Power

Power supplies and external adapters

Safety, EMC and efficiency for external power supplies — where the EU ecodesign regulation and the US DoE rule pull in different directions.

Standards covered
  • IEC 62368-1
  • EN 55032 / EN 55035
  • EU 2019/1782 (ecodesign, external power supplies)
  • US DoE 10 CFR 430 Subpart B
  • IEC 62301 (standby power)
Sample requirements

3 units per output rating, with the cable and connector you ship

Typical turnaround

8–12 working days for safety plus efficiency

An external adapter carries three obligations at once: it must be safe, it must be quiet, and it must hit an efficiency number. The third one is where projects get surprised, because the limit is not the same number in every market.

Efficiency is a specification, not a by-product

Average active efficiency and no-load power are measured at defined load points. A design that passes at full load can still fail at 10 percent load, which is exactly where the regulation looks. We measure the load points the regulation names, not a convenient subset.

One report, several markets

Where the test methods overlap we run them once and report per market, so you are not paying for the same measurement three times. Where they diverge — and with efficiency rules they do — each market gets its own result table.

What you receive

  • Safety report
  • EMC report
  • Efficiency table by load point
  • Market-by-market compliance summary

Frequently asked

Does an adapter need its own CE marking?

An external power supply is placed on the market as a separate product, so yes, it carries its own obligations.

Which load points do you measure for efficiency?

The ones the regulation defines — typically 10, 25, 50, 75 and 100 percent of rated output, plus no-load.

Next step

Send the product. Get a written route.

Standards, sample quantity, timeline and deliverables confirmed before samples move.

Request a quote