EMC testing
Emissions and immunity to CISPR and IEC 61000, run with a pre-scan first so a formal run is not the first time you see the spectrum.
- CISPR 32 / EN 55032
- CISPR 35 / EN 55035
- CISPR 14-1 / 14-2
- IEC 61000-3-2
- IEC 61000-3-3
- IEC 61000-4 series
1–2 units in the final enclosure, with representative cabling and the intended load
5–7 working days; pre-scan results in 24–48 hours
Most EMC failures are not mysterious. They come from a cable, a grounding path, or a switching node that was never looked at with a probe. A pre-scan finds those before the formal run, when there is still time to change the board.
Emissions and immunity in one plan
Conducted and radiated emissions, plus the immunity set the product’s environment actually requires. A household appliance and an industrial controller do not share an immunity table, and applying the wrong one produces a report nobody can use.
- Pre-scan with spectrum plots and near-field probing to locate the source.
- Formal run to the applicable CISPR / IEC 61000 clauses once the design is stable.
- Margin reported as a number, not a pass stamp — a 1 dB margin is a production risk.
When it fails
We hand over the plot, the frequency, and the likely coupling path. That is usually enough for a hardware team to fix it without a second visit. If a filter change is needed, we can retest the affected item rather than the whole plan.
What you receive
- Pre-scan spectrum plots
- Formal test report
- Margin summary by frequency
- Recommended next step if a limit is exceeded
Frequently asked
Why do you insist on a pre-scan?
Because a formal run on an unproven design usually ends in a fail and a wasted week. The pre-scan costs a fraction of that and tells you where the problem is.
Can you test at my site?
For very large systems, yes, with limitations on the environment. Most products are better tested in the chamber.
Do I need immunity testing if I only sell in the US?
FCC rules are emissions-focused. Immunity is a separate commercial requirement — check what your customer contract says.
Send the product. Get a written route.
Standards, sample quantity, timeline and deliverables confirmed before samples move.