Independent testing & market access support for global markets cert@tmc-lab.com +86 755 8664 2861
Solutions Testing services Certification Accreditation Success stories Insights Request a quote →
01 / Safety

Electrical safety testing

IEC 62368-1 and the IEC 60335 / 61010 families — the testing that decides whether a product can carry a safety mark at all.

Standards covered
  • IEC 62368-1
  • IEC 60335-1
  • IEC 61010-1
  • IEC 61558-1
  • IEC 60529 (IP)
Sample requirements

2–3 production units plus one spare, final firmware, with the power supply you intend to ship

Typical turnaround

7–10 working days from sample receipt; 48-hour pre-scan available

Safety testing answers one question: under a single fault, does the product stay safe? Everything else in the report — creepage, clearance, temperature rise, abnormal operation — is evidence for that answer.

How we run it

We build the test plan from the product’s construction and its intended use, not from a template. A 65 W USB-C adapter and a 65 W LED driver sit under different clauses even when they look alike on the bench, and getting that wrong is how a project loses two weeks on a retest.

  • Construction review against the clause set before any sample is powered.
  • Critical components checked against the certificate the supplier actually holds — not the datasheet claim.
  • Abnormal tests run to the clause that applies, with the failure mode photographed and logged.

What the report tells you

Every non-compliance is written with its clause reference and the measured value next to the limit, so a hardware engineer can act on it without asking us what we meant. Where a fix is obvious we say so; where it is a design decision, we say that instead.

Scope is confirmed against our CNAS accreditation before we accept samples. If a clause falls outside it, you hear that on day one rather than in the report.

What you receive

  • Test report (PDF, signed)
  • Clause-by-clause results table
  • Non-compliance list with clause references
  • Photo appendix of the as-tested build

Frequently asked

Do you test prototypes or only production units?

Both, but the report states which build was tested. A prototype report is useful for design decisions and generally not accepted for a declaration of conformity.

Can you test a product that already failed elsewhere?

Yes, and it is common. Send the earlier report if you have it — it shortens the plan.

Is the report accepted in the EU and UK?

The report is evidence; the manufacturer signs the declaration of conformity. What matters is that the standard edition and the test scope match the route you are claiming.

Next step

Send the product. Get a written route.

Standards, sample quantity, timeline and deliverables confirmed before samples move.

Request a quote